Superior Energy Services
1105 Peters Road
Harvey, LA 70058
Phone: 504-362-4321
Fax: 504-362-1818
Subsea Intervention Lubricator System![[Icon]](/image/icon_well.gif)
Get to the bottom — and protect the bottom line — with SILS
The Subsea Intervention Lubricator System (SILS) can help operators reduce costs and improve service scheduling for subsea plugging and abandonment, slickline and wireline services in depths up to 10,000 feet.
The SILS made its debut in late 2007, performing a well intervention in the Gulf of Mexico where it successfully closed and isolated a depleted lower zone and opened a productive upper zone in a subsea well.
A joint venture between Superior Energy Services and Oceaneering, the SILS is designed to perform cost-effective, safe, deepwater wireline-based subsea well interventions without the need for a drilling rig or workover riser.
SILS Specifications
General
- Maximum Working Pressure: 10000psi
- Design Water Depth: 10000'
- Wire: Slickline thru .125" O.D.
- Nominal Bore: 5-1/2"
Stuffing Box
- Recovers to surface w/ tool string
- Dual independently operated packing elements
Lubricator Sections
- Hydraulically operated stuffing box latch
- Flushing port w/ valve
- (3) 10' lubricator sections
- Hydraulically opened, spring closed tool trap
- 13-5/8" hydraulic connector to BOP
BOP
- Flushing Port w/ valve
- Wire cutting shear-seal upper ram
- Stripper ram
- Gripper ram
- Tool cutting shear-seal lower ram
- Circulation port w/ 2 valves
- Crossover flange (to adapt to various connectors)
- 18-3/4" H4 style connector (adaptable to other styles)
System
- All valves are normally closed. All valves have provisions for ROV override.
- Rams have provision for ROV override. All rams are fail safe closed. All rams lock in closed position.
- 5500' IWOCS control with 3 spare leads for tree control
- Spare circulation line for connection to annulus
- Dual coil tubing for circulation, 7,000 ft depth capability
Contingency
Drive Off:
- Automatic disconnection of coil tubing
- Guillotine of IWOCS
- Fail safe valve and ram actuation
Rig Re-entry:
- Provisions for re-entering the well thru BOP w/ rig and drill pipe
